In this paper, a new approach for identifying fuzzy critical path is presented, based on converting the
fuzzy network project into deterministic network project, by transforming the parameters set of the fuzzy
activities into the time probability density function PDF of each fuzzy time activity. A case study is considered as
a numerical tested problem to demonstrate our approach.