Mass Timber Group’s cover photo
Mass Timber Group

Mass Timber Group

Building Construction

Denver, Colorado 12,044 followers

Connecting the AEC and Mass Timber Industries | 2025 Summit | Podcast | Mass Timber Media Services

About us

Educate 𝐖𝐞 𝐨𝐟𝐟𝐞𝐫 𝐢𝐧-𝐩𝐞𝐫𝐬𝐨𝐧 𝐰𝐨𝐫𝐤𝐬𝐡𝐨𝐩𝐬 g𝐢𝐯𝐢𝐧𝐠 𝐲𝐨𝐮 𝐬𝐭𝐞𝐩-𝐛𝐲-𝐬𝐭𝐞𝐩 𝐩𝐫𝐨𝐜𝐞𝐬𝐬𝐞𝐬 𝐚𝐧𝐝 𝐩𝐫𝐨𝐜𝐞𝐝𝐮𝐫𝐞𝐬 𝐨𝐧 𝐡𝐨𝐰 𝐭𝐨 𝐛𝐮𝐢𝐥𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬 𝐢𝐧 𝐲𝐨𝐮𝐫 𝐚𝐫𝐞𝐚. Network 𝐂𝐨𝐦𝐞 𝐧𝐞𝐭𝐰𝐨𝐫𝐤 𝐰𝐢𝐭𝐡 𝐌𝐚𝐬𝐬 𝐓𝐢𝐦𝐛𝐞𝐫 𝐢𝐧𝐝𝐮𝐬𝐭𝐫𝐲 𝐩𝐫𝐨𝐟𝐞𝐬𝐬𝐢𝐨𝐧𝐚𝐥𝐬. 𝐖𝐞 𝐜𝐫𝐞𝐚𝐭𝐞 𝐚 𝐟𝐮𝐧 & 𝐫𝐞𝐥𝐚𝐱𝐞𝐝 𝐞𝐧𝐯𝐢𝐫𝐨𝐧𝐦𝐞𝐧𝐭 𝐭𝐨 𝐦𝐞𝐞𝐭 𝐩𝐞𝐨𝐩𝐥𝐞, 𝐛𝐮𝐢𝐥𝐝 𝐫𝐞𝐥𝐚𝐭𝐢𝐨𝐧𝐬𝐡𝐢𝐩𝐬, 𝐚𝐧𝐝 𝐝𝐨 𝐛𝐮𝐬𝐢𝐧𝐞𝐬𝐬 𝐭𝐨𝐠𝐞𝐭𝐡𝐞𝐫. "𝑰𝒕'𝒔 𝒏𝒐𝒕 𝒘𝒉𝒂𝒕 𝒚𝒐𝒖 𝒌𝒏𝒐𝒘, 𝒊𝒕'𝒔 𝒘𝒉𝒐 𝒚𝒐𝒖 𝒌𝒏𝒐𝒘 𝒕𝒉𝒂𝒕 𝒎𝒂𝒕𝒕𝒆𝒓𝒔 𝒎𝒐𝒔𝒕." Advocate 𝐓𝐡𝐞𝐫𝐞'𝐬 𝐚 𝐜𝐥𝐞𝐚𝐧𝐞𝐫, 𝐥𝐢𝐠𝐡𝐭𝐞𝐫, 𝐟𝐚𝐬𝐭𝐞𝐫, 𝐰𝐚𝐲 𝐨𝐟 𝐜𝐨𝐧𝐬𝐭𝐫𝐮𝐜𝐭𝐢𝐨𝐧 t𝐡𝐫𝐨𝐮𝐠𝐡 𝐡𝐞𝐚𝐥𝐭𝐡𝐲 𝐟𝐨𝐫𝐞𝐬𝐭 𝐦𝐚𝐧𝐚𝐠𝐞𝐦𝐞𝐧𝐭, s𝐦𝐚𝐥𝐥-𝐝𝐢𝐚𝐦𝐞𝐭𝐞𝐫 𝐥𝐨𝐠𝐬 𝐚𝐫𝐞 𝐡𝐚𝐫𝐯𝐞𝐬𝐭𝐞𝐝, 𝐫𝐞𝐩𝐥𝐚𝐧𝐭𝐞𝐝, 𝐚𝐧𝐝 𝐦𝐚𝐧𝐮𝐟𝐚𝐜𝐭𝐮𝐫𝐞𝐝 𝐢𝐧𝐭𝐨 𝐌𝐚𝐬𝐬 𝐓𝐢𝐦𝐛𝐞𝐫 𝐩𝐚𝐧𝐞𝐥𝐬 𝐚𝐧𝐝 𝐛𝐞𝐚𝐦𝐬. Construct 𝐖𝐞 𝐨𝐰𝐧, 𝐨𝐩𝐞𝐫𝐚𝐭𝐞, 𝐚𝐧𝐝 𝐫𝐞𝐧𝐭 𝐨𝐮𝐭 𝐦𝐮𝐥𝐭𝐢𝐟𝐚𝐦𝐢𝐥𝐲 𝐮𝐧𝐢𝐭𝐬 𝐢𝐧 𝐖𝐞𝐬𝐭𝐞𝐫𝐧 𝐌𝐨𝐧𝐭𝐚𝐧𝐚. 𝐈𝐧 𝟐𝟎𝟐𝟏 𝐰𝐞 𝐩𝐢𝐯𝐨𝐭𝐞𝐝 𝐟𝐫𝐨𝐦 𝐛𝐮𝐲𝐢𝐧𝐠 𝐨𝐥𝐝 𝐭𝐫𝐚𝐝𝐢𝐭𝐢𝐨𝐧𝐚𝐥 𝐬𝐭𝐢𝐜𝐤-𝐟𝐫𝐚𝐦𝐞 𝐡𝐨𝐦𝐞𝐬 - 𝐭𝐨 𝐝𝐞𝐯𝐞𝐥𝐨𝐩𝐢𝐧𝐠 𝐬𝐮𝐬𝐭𝐚𝐢𝐧𝐚𝐛𝐥𝐲 𝐰𝐢𝐭𝐡 𝐌𝐚𝐬𝐬 𝐓𝐢𝐦𝐛𝐞𝐫.

Website
https://masstimberhub.masstimber.group/resources
Industry
Building Construction
Company size
2-10 employees
Headquarters
Denver, Colorado
Type
Partnership
Founded
2021
Specialties
Mass Timber, Networking Events, Conferences, Education, Podcast, and Building Tours

Locations

Employees at Mass Timber Group

Updates

  • 🌲 Mass timber’s top players are heading to Denver ⚡ If you’re not there, you’re already behind 🏛️ 𝗔𝗱𝘃𝗮𝗻𝗰𝗲𝗱 𝗰𝗼𝗻𝘁𝗲𝗻𝘁. 𝗘𝗽𝗶𝗰 𝘃𝗲𝗻𝘂𝗲𝘀. 𝗡𝗼 𝗳𝗹𝘂𝗳𝗳 🎉 The 𝟮𝟬𝟮𝟱 𝗠𝗮𝘀𝘀 𝗧𝗶𝗺𝗯𝗲𝗿 𝗚𝗿𝗼𝘂𝗽 𝗦𝘂𝗺𝗺𝗶𝘁 is officially LIVE for registration — and guess what? We just dropped a 𝗯𝗿𝗮𝗻𝗱 𝗻𝗲𝘄 𝘄𝗲𝗯𝘀𝗶𝘁𝗲 so slick, it should come with a seatbelt. AND — we’ve got 𝗮 𝗵𝗶𝗴𝗵𝗹𝗶𝗴𝗵𝘁 𝘃𝗶𝗱𝗲𝗼 to show you exactly why this Summit is different. 📍 𝗔𝘂𝗴𝘂𝘀𝘁 𝟮𝟬-𝟮𝟮, 𝟮𝟬𝟮𝟱 📍 𝗗𝗲𝗻𝘃𝗲𝗿, 𝗖𝗼𝗹𝗼𝗿𝗮𝗱𝗼 (an industry leader) 📍 Hosted at the 𝗗𝗲𝗻𝘃𝗲𝗿 𝗔𝗿𝘁 𝗠𝘂𝘀𝗲𝘂𝗺  (because you deserve better than a boring, windowless venue) 👷♀️ Who’s this for?  ✅Architects ✅Engineers ✅GCs ✅Installers ✅Developers ✅Owners ✅Manufacturers ✅Suppliers ✅Fabricators ✅Core Project Teams 👉 𝗧𝗵𝗲 𝘁𝗲𝗮𝗺𝘀 𝘄𝗵𝗼 𝗮𝗰𝘁𝘂𝗮𝗹𝗹𝘆 𝗯𝘂𝗶𝗹𝗱 𝘀𝘁𝘂𝗳𝗳.  If you’re serious about upping your #MassTimber game — then this Summit is designed for you! 💥 Why you can’t miss this:  ✅ 𝗔𝗱𝘃𝗮𝗻𝗰𝗲𝗱 𝗰𝗼𝗻𝘁𝗲𝗻𝘁  No fluff — straight to the 300/400-level insights  ✅ 𝗧𝗼𝗽 𝗲𝘅𝗽𝗲𝗿𝘁𝘀, 𝗿𝗲𝗮𝗹 𝗹𝗲𝘀𝘀𝗼𝗻𝘀 𝗹𝗲𝗮𝗿𝗻𝗲𝗱  No sugarcoating, no sales pitches  ✅ 𝗡𝗲𝘁𝘄𝗼𝗿𝗸𝗶𝗻𝗴 𝘁𝗵𝗮𝘁 𝗱𝗼𝗲𝘀𝗻’𝘁 𝘀𝘂𝗰𝗸  Rooftop parties, the elegance of an art museum & professional baseball game experience ✅ 𝗗𝗲𝗻𝘃𝗲𝗿’𝘀 𝗯𝗼𝗼𝗺𝗶𝗻𝗴 #𝗠𝗮𝘀𝘀𝗧𝗶𝗺𝗯𝗲𝗿 𝘀𝗰𝗲𝗻𝗲 The best building tours Denver offers 🆕 𝗡𝗘𝗪 𝗧𝗛𝗜𝗦 𝗬𝗘𝗔𝗥: Developer Track + 75% off for developers 🎟️ Early bird pricing is LIVE — it jumps every month. 𝗪𝗮𝘁𝗰𝗵 𝘁𝗵𝗲 𝘃𝗶𝗱𝗲𝗼, 𝗰𝗵𝗲𝗰𝗸 𝗼𝘂𝘁 𝘁𝗵𝗲 𝗻𝗲𝘄 𝘀𝗶𝘁𝗲 & 𝗴𝗿𝗮𝗯 𝘆𝗼𝘂𝗿 𝘀𝗽𝗼𝘁: 👉 https://lnkd.in/gAY-GMvS 👈 This is the Summit for real decision makers in the mass timber game. See you in Denver. #MassTimberGroup #MTGSummit #MassTimber #AEC #Denver2025

  • 🦅 Building MassTimber for DeafSpace 📝 Washington School for the Deaf, Divine Academic & Hunter Gymnasium 📰 Here's what we learned from the project team:   Built for the future needs of those with visual, tactile, and spatial needs.   👉🏼 Shauna Bilyeu, executive director, said: “This expansion means two brand new and much-needed spaces for improved learning and athletics in this unique student environment,” she said. She further elaborated on the tangible design outcomes, mentioning “wider-set hallways for active ASL (American Sign Language) communication and so much other care and concern for the needs of our unique community”.   👉🏼 Natural lighting was another key element, with extensive use of large windows – often with low-glare coatings to prevent eye strain.   👉🏼 The project utilized 131 cubic meters of glulam (a running length of 5770 feet) and 308 cubic meters of CLT (roughly 10,876 cubic feet).   👉🏼 The use of wood also pays homage to the school's history, connecting back to a demolished campus landmark, the Red Barn, which held deep community significance.   ♻️ The expanded CDHY campus isn't just about new buildings; it's about creating a holistic environment that fosters linguistic, cognitive, social, and emotional development while honoring Deaf culture. The new 35,000-square-foot Divine Academic Building includes innovative classrooms and a media center, while the 15,000-square-foot Hunter Gymnasium provides a purpose-designed space for physical education. A sensory-focused and accessible playground, a secure walkway connecting the buildings, and an improved parking area further enhance the campus. A new outdoor field is slated for completion in Spring 2025.   📰 Read the full article to see what the #AEC and mass timber teams had to say about their experience working on this magnificent project. . . . ❓ What project should we cover next? Let us know below! . . . We'll be releasing original #MassTimber spotlight articles every week!

  • Mass Timber Vision at the Base Ski Town USA® 🌏 Steamboat Springs, CO   Completed in 2023, Steamboat's Base Village was reimagined by Gensler & Martin/Martin.   "The Range’s mass timber structure fits the local architectural language and helped decrease the embodied carbon of the structure and expedited the construction schedule." - Gensler   🌲 Wood Design Specs: Hybrid #Glulam Post & Beam Timber-Frame   "Steamboat is the second-largest ski area in Colorado with 3,741 acres. Steamboat is also the largest ski area in the world that utilizes a single ski base to accommodate approximately 1.4 million skiers annually; an average of over 10,000 skiers daily." - pinion newswire   👷🏽 Project Partners: Gensler Martin/Martin, Inc. East West Partners Photography Credits: Martin/Martin . . . . . . #GlueLaminatedTimber #CrossLaminatedTimber #BuildWithWood #Construction 

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • ❤️🔥 Rising from the Ashes 🍃 A #MassTimber Recovery Story 🌏 Morden, Manitoba, Canada   Seeing fire twice, this mass timber build is special to the community of Morden.   "This new clubhouse proves that a beautiful recovery can follow calamity. A fire destroyed Minnewasta’s old timber frame clubhouse in November 2021 and within a few months a modern mass timber clubhouse design was underway." - Cornerstone Timberframes   ✍ Design Specs: Recreational Completed in 2024 11,300 ft² (1,049 m²)   "Floor-to-ceiling glass in the 160-seat dining area combine with extensive patios and walkways to connect guests with the site’s impressive natural setting." - Cornerstone Timberframes   👷🏽 Project Partners: Designer: LM Architectural Group Builder: Triple E Developments Mass Timber: Cornerstone Timberframes / Nordic Structures Photography Credits: Cornerstone Timberframes . . . . . . #GlueLaminatedTimber #CrossLaminatedTimber #BuildWithWood #Construction 

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • 🛡️ A Mass Ply Marvel 🌳 Redmond's #Sustainable Hub 🌏 Redmond, WA   "This massive 52,000-square-foot facility will replace the city’s former senior center and provide space for recreational events and activities for Redmond’s senior residents and local families. The new center will also showcase the community’s reverence for the surrounding landscape, encouraging visitors to make the most of the amenities indoors as well as outdoor features like grassy areas and trails along the picturesque Sammamish River." - Freres Wood   ✍ Design Specs: 2 Stories Completed in 2023 40,000 ft² (3,716 m²) Recreational Building   🏆 #Sustainability award: LEED innovation point from the U.S. Green Building Council   "Sustainable Northwest, Opsis, and Freres traced and verified the source of the lumber for the Mass Plywood Panels used in the Redmond Center, which is an advancement in traceability that opens the door to recognize and reward forest stewardship in all its forms, regardless of whether landowners take part in certification – including federal agencies practicing ecological forestry and Tribes whose stewardship often reflects unique Traditional Ecological Knowledge." - Sustainable Northwest   👷🏽 Project Partners: PAE Absher Herrera Inc. Lund Opsahl Carpentry Plus City of Redmond LittleFish Lighting Opsis Architecture Simpson Strong-Tie Johnston Architects Sustainable Northwest Freres Engineered Wood Groundswell Landscape Architecture Photography Credits: Carpentry Plus . . . . . . #GlueLaminatedTimber #CrossLaminatedTimber #BuildWithWood #Construction 

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +1
  • 🏔️ Mass Timber Mountainside Meals ⛷️ Resort applications for mass timber 🌏 Big Sky, MT   "As a high-altitude fine-dining environment, the interiors program came with a specific set of challenges, creating a refined experience that would also be resilient to ski equipment and high traffic. " - CCY Architects   🌲 Design Specs: 2 Stories Built in 2023 16,500 Square Feet   🌲 Wood Design Specs: #CLT #Glulam Cedar Siding Beams & Columns   👷🏽 Partners: USG CCY Architects Kalesnikoff Mass Timber Jackson Contractor Group Yellowstone Mountain Club KL&A Engineers and Builders Photography Credit: CCY Architects (If you know any other project partners, please tag them in the comments below 👇) . . . . . #CrossLaminatedTimber #MassTimberConstruction #Construction 

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • 🏢 Mass Timber Student Gathering Place 🍽️ Student Center & Dining Commons 🌏 Amherst College, Massachusetts   🦺 Under construction until 2026, this is a signature space on campus essential to supporting and sustaining a vibrant student experience in ways that go beyond the classroom.   "Designed by the architecture firm Herzog & de Meuron with the intention of creating a structure that quietly and effectively brings out the best in its surroundings, the new building will feature spectacular views of the Holyoke Range and the area’s distinctive topography. It will exemplify sustainable, environmentally-responsive architecture, designed to affirm the connection between the built environment and the natural world, which is integral to the Amherst experience." - Amherst College   ✅ Reflecting Amherst College's commitment to sustainability, the project repurposes the concrete structure of the former Merrill Science Center and incorporates mass-timber construction, reducing material waste and preserving embodied carbon.   ✅ The topping-out ceremony involved the signing of a final timber panel, which was then lifted and installed as the last beam.   "Reflecting Amherst College’s commitment to sustainability, the project repurposes the concrete structure of the former Merrill Science Center and incorporates mass-timber construction. This approach reduces material waste and preserves embodied carbon, which aligns with the college’s climate action plan." - Herzog & de Meuron . . . . . #MassTimber #MassTimberConstruction #Construction

Affiliated pages

Similar pages

Browse jobs