Feed mill operation precautions
Feed mill operation precautions

Feed mill operation precautions

Feed mill operation precautions

1. First choose the installation location of the crusher and power machine. For long-term fixed operations, the unit should be fixed on the concrete base. The unit must be installed firmly and without looseness; the pulleys of the two machines should be in a straight line and should not be skewed.

2. After the base is fully solidified, repeat the system to statically check the unit thoroughly, and then carry out the dynamic empty load test run for 3 to 5 minutes. If there is no abnormality, it can be officially put into operation.

3. If you use electricity for power, you should find a reasonable layout of the line by a professional (electrician). The electrical lines and facilities should be neatly arranged and must not be installed and used in private.

4. When the pulverizer is put into operation for about 10 days, the cover should be opened, and the running parts such as the rotor and the hammer should be inspected. The bolts should be tightened to check whether the bearings are well lubricated. If there is stuck or rubbing, Eliminate in time.

 5. Carefully check the processed materials during work, and remove hard objects such as nails, stones, and iron wires to avoid injury or damage.

6. The operator is strictly forbidden to wear gloves. When feeding materials, they should stand on the side of the crusher to avoid rebounding debris and damage the face. Do not hold too tight when smashing long stalk crops to prevent accidents.

 7. During the operation process, pay close attention to the working condition of the pulverizer. If vibration, abnormal noise, excessive temperature of the bearing and the machine parts or external spraying are found, stop the inspection immediately and continue working after troubleshooting. .

8. When the blockage occurs and the load is too heavy, stop it immediately. It is strictly forbidden to use a wooden stick or hand to force the feed to avoid injuring the arm and damaging the machine. After each shift is completed, the unit should be inspected and maintained to ensure that the unit is in good condition.

If you want to know more about related products, please continue to pay attention Henan Lima Machinery Manufactory CO.,LTD