ANDRITZ Hydro’s cover photo

About us

From the historic pioneers of technology to a modern global market leader ANDRITZ Hydropower is one of the world's leading suppliers of electromechanical equipment and services for hydropower stations in the dynamically growing global renewable energy market. Based on 185 years of experience and a global installed capacity of 489 gigawatts, we offer innovative solutions for new and existing hydropower stations, from small hydropower to large-scale plants. State-of-the-art digital solutions, comprehensive services for the operation and maintenance of entire hydropower plants, and turbo generators for the thermal industry complete the portfolio. #andritz # #Hydropower #RenewableEnergy #energy #sustainability #GreenTransition #CleanEnergy

Industry
Machinery Manufacturing
Company size
5,001-10,000 employees
Headquarters
Vienna
Type
Privately Held
Founded
1805
Specialties
Large Hydro, Service & Rehab, Compact Hydro, Turbo Generators, Synchronous condensers, Electromechanical Equipment, and Hydromechanical Equipment

Locations

  • Primary

    Eibesbrunnergasse 20

    Vienna, 1120, AT

    Get directions
  • 83 Zone B Sanshui Central, Technical & Industrial Park, Sanshui District

    Foshan, Guangdong Province 528137, CN

    Get directions
  • 3 Spring St

    Sydney, New South Wales 2000, AU

    Get directions
  • Stattegger Straße 18

    Graz, Styria 8045, AT

    Get directions
  • Lunzerstraße 78

    Linz, Upper Austria 4030, AT

    Get directions
  • Dr.-Karl-Widdmann-Strasse 5

    Weiz, Styria 8160, AT

    Get directions
  • Av. Manoel de Abreu, s/n°. km 4,5, piso superior do prédio H,

    Araraquara, Sao Paulo CEP 14806-500, BR

    Get directions
  • Alameda Tocantins 350

    sala 1204

    Barueri, Sao Paulo 6455020, BR

    Get directions
  • Rue Graham Bell 1451

    Boucherville, Quebec J4B 6A1, CA

    Get directions
  • 895 George V Ave.

    Lachine, Quebec H8S 2R9, CA

    Get directions
  • 6 Adams Street

    Paris, Ontario, Ontario N3L 3X4, CA

    Get directions
  • 100 Jameson Dr

    Unit 3

    Peterborough, Ontario K9J 6X6, CA

    Get directions
  • 6100 Trans Canada Highway

    Pointe-Claire, Quebec, CA

    Get directions
  • 13700 International Place

    Richmond, British Columbia V6V 2X8, CA

    Get directions
  • 7920 Rue Samuel-Hatt

    Chambly, Quebec J3L 6W4, CA

    Get directions
  • Avenida Andres Bello 2777

    Santiago de Chile, Santiago 7550053, CL

    Get directions
  • No. 188 Datong Road, Datong Town, Qingbaijiang District

    Chengdu, Sichuan 610300, CN

    Get directions
  • Rm. 18B1-B10, 18F Hanwei Plaza, 7 Guanghua Road

    Beijing, Beijing 100020, CN

    Get directions
  • Cr 67 No 100-20 of 801

    Bogotá, Bogota 111211, CO

    Get directions
  • Krajinská 32/7

    Ceske Budejovice, South Bohemian 37001, CZ

    Get directions
  • Hatanpään valtatie 11

    Tampere, Pirkanmaa 33100, FI

    Get directions
  • 11 Apakidze Street, apt. 140, Vake-Saburtalo district

    Tbilisi, Tbilisi 171, GE

    Get directions
  • Französische Straße 12

    Berlin, BE 10117, DE

    Get directions
  • Escher-Wyss Weg 1

    Ravensburg, Baden-Württemberg 88212, DE

    Get directions
  • Dózsa telep utca 69

    Tiszakécske, Bács-Kiskun 6060, HU

    Get directions
  • D-17, MPAKVN Industrial Area, District Raisen, near Bhopal

    Mandideep, Madhya Pradesh 462 046, IN

    Get directions
  • A-24/3, Mohan Estate Building Mathura Road

    New Delhi, National Capital Territory of Delhi 110 044, IN

    Get directions
  • Mathura Road 49/5

    Village Prithla, Haryana 121 102, IN

    Get directions
  • Jl. Talang No. 3, Pegangsaan, Menteng

    Jakarta, Jakarta 10320, ID

    Get directions
  • Via Daniele Manin 16/18

    Schio, Province of Vicenza 36015, IT

    Get directions
  • Harumi Island Triton Square Office Tower Y 29F

    1-8-11 Harumi,

    Tokyo, Tokyo 104-6129, JP

    Get directions
  • Office Rooms 3-001 and 3-002, 3th floor, 13/195 Republic Square

    Almaty, Almaty 50013, KZ

    Get directions
  • EDL Building, Lao-Thai Friendship Road, Thongkang village

    Vientiane Capital, Vientiane Prefecture 2392, LA

    Get directions
  • A-30-7 Level 30, Block A, Menara UOA Bangsar

    Kuala Lumpur, Kuala Lumpur 59000, MY

    Get directions
  • Av. Ciudad Industrial No. 977, Col. Ciudad Industrial

    Morelia, Michoacan 58200, MX

    Get directions
  • Corner of Bogyoke Aung San Road and 27th Street

    Level 10, Unit 01-05

    Yangon, 11141, MM

    Get directions
  • 2nd Floor, Max Tower, Opposite of Kathmandu Plaza, Kamaladi Road, Ward No. 28

    Kathmandu Metropolitan City, Kathmandu 44600, NP

    Get directions
  • 4B / 114 Sawyers Arms Road

    Christchurch, Canterbury 8052, NZ

    Get directions
  • Energiveien 9

    Jevnaker, Innlandet 3520, NO

    Get directions
  • Oficina 1603 - Edificio Omega, Av. Manuel Olguín 211, Surco

    Lima, Lima Peru, PE

    Get directions
  • Unit 1906, 88 Corporate Center, 141 Valero cor. Sedeno Streets, Salcedo Village

    Makati City, National Capital Region 1227, PH

    Get directions
  • Edifício Península, Praça do Bom Sucesso, n. 127-131, escritório 508

    Porto, Greater Porto 4150-146, PT

    Get directions
  • Avenue Félix Eboué 1er étage Immeuble SDV

    Brazzaville, Brazzaville 2345, CG

    Get directions
  • Vaplans Väg 29

    Nälden, Jamtland Lan 83505, SE

    Get directions
  • Obernauerstrasse 4

    Kriens, Lucerne 6010, CH

    Get directions
  • Rue des Deux Gares 6

    Vevey, Vaud 1800, CH

    Get directions
  • Werkstrasse 4

    Jonschwil, Canton of St. Gallen 9243, CH

    Get directions
  • Polígono Industrial La Garza 2

    Carretera de Algete M-106, Km. 2

    Algete, Community of Madrid 28110, ES

    Get directions
  • 10026 Sokak No: 11

    ITOB Organize Sanayi Bölgesi

    Izmir, TR

    Get directions
  • Volodymyrska Str. 77-A

    Kiev, Kiev 1033, UA

    Get directions
  • 300 Bath Street

    Tay House, 2nd Floor Spaces, Office 45

    Glasgow, Scotland G2 4JR, GB

    Get directions
  • 15708 E Marietta Ln

    Spokane Valley, Washington 99216, US

    Get directions
  • 10735 David Taylor Dr

    Suite 500

    Charlotte, North Carolina 28262, US

    Get directions

Employees at ANDRITZ Hydro

Updates

  • Le Cheylas, Isère, France – Generator rehabilitation In January 2025, ANDRITZ signed a contract with @EDF (Électricité de France) for the rehabilitation of the generator on Unit 2 at the Le Cheylas powerplant in Isère, France. The refurbishment project for this 270 MVA machine (bore diameter: 6,250 mm, iron height: 2,450 mm, weight: 235 tons) includes the engineering and the supply of a complete stator and pole coils. After the engineering and the manufacturing, our teams of specialists in Switzerland and Austria will also carry out the on-site installation of the new stator and the refurbished poles and perform the electrical and commissioning tests. We would like to thank our customer EDF for their valuable cooperation and for their trust. We also wish the best of success to all the ANDRITZ teams involved in this project. #andritz #Hydropower #RenewableEnergy #generator #rehabilitation #France #EDF #ForGrowthThatMatter

    • No alternative text description for this image
  • Massive 165-ton valves successfully delivered 🚢 to PSP Dinorwig, UK! Following the successful handover of the first two main inlet valves for the Dinorwig pumped storage power plant to the customer last year, a further four identical oversized valves, weighing an impressive 165 tons, were shipped together by ship to the UK at the beginning of 2025. This logistical feat underlines our ability to handle even the most challenging transport tasks reliably and efficiently. A big thank you to our dedicated team and our partners who made this success possible. 👏 The six pump turbines at Dinorwig have a total output of 1,728 MW. The pumped storage power station therefore plays a central role in ensuring the stability of the British electricity grid. ⚡The spherical valves, as shut-off devices, secure the flow of water to the pump turbines. The installation 🔧 of the four recently delivered main inlet valves will take place in parallel later this year. ANDRITZ is proud to have successfully completed the challenging transport and to make Dinorwig fit for the future with the upcoming installation and commissioning of these spherical valves. #Hydropower #RenewableEnergy #ANDRITZ #Dinworwig #PumpedStorage #PumpedHydro #transport

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +3
  • 🚀 Driving Greenko's Gandhisagar PSP forward! 🌿⚡ As India’s groundbreaking Pinnapuram PSP - the nation’s first and largest fully integrated renewable energy project - nears completion, ANDRITZ is thrilled to announce the commencement of site works for Greenko’s next prestigious venture: the 1,920 MW-Gandhisagar pumped storage plant! With an unwavering commitment to innovation, ANDRITZ has mobilized site operations and will be delivering the complete electromechanical package for this ambitious pumped storage project. In seamless partnership with its distinguished client, Greenko, the pre-assembly of draft tubes, spiral cases, and stay rings is already in progress—laying the foundation for another milestone in India’s green energy evolution. 🌍 Driving the future of renewable energy, one breakthrough at a time! ANDRITZ remains at the forefront of the green energy transition - championing sustainability with passion and purpose. ✨ Stay tuned for more electrifying updates! ⚡ #andritz #hydropower #renewableenergy #ForTheChange #energy #india #Greenko

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +1
  • Milestone Achieved at NHPC’s Rangit-IV Hydropower Project in India 📍 Rangit-IV, Sikkim, India We are proud to announce a significant achievement in the execution of electromechanical works at the Rangit-IV Hydropower Project, located in the scenic landscapes of Sikkim, India. ANDRITZ, in close collaboration with our valued client, M/s. JPCL—a wholly owned subsidiary of NHPC—has successfully completed the lowering and installation of the rotor for Unit 3 in March 2025. This marks a key milestone in the project's progress and shows the dedication, technical excellence, and coordination of our expert team. As the project advances, we remain focused on completing the remaining installations in the coming months, reinforcing our commitment to reliable project delivery and sustainable energy development. At ANDRITZ, we are dedicated to accelerating the global transition to clean energy and are proud to support India’s efforts toward a greener future. #ANDRITZ #RenewableEnergy #Hydropower #CleanEnergy #GreenTransition #ForGrwothThatMatters #NHPC #IndiaEnergy

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • ANDRITZ Hydro reposted this

    One of the key technologies at the heart of the energy transition is pumped storage hydropower plants.🔋These "green batteries" offer an efficient way of balancing the natural fluctuations of renewable energy sources and stabilizing the electricity grid, thereby ensuring a secure supply. An outstanding example of the use of this technology is the Ebensee pumped storage power plant in Upper Austria, which will be operated by @Energie AG. The construction of Energie AG's Ebensee pumped storage power plant is a major step toward climate neutrality 🌿 and achieving the climate targets for Upper Austria and Austria as a whole. The Ebensee pumped storage power plant is scheduled to be connected to the grid in 2028 and will supply about 280,000 households with green electricity. - On course of climate neutrality! ✅ 👉 Read more about Ebensee in Austria in our latest customer magazine HydroNews No.38, available online and in our Hydro News App for Apple and Android. Hydro News 38 (en) | Download the app here for Android https://lnkd.in/dAwaYwgX and here for Apple https://lnkd.in/d3zRZqdX #Hydropower #RenewableEnergy #CleanEnergy #PumpedStorage #PumpedHydro #ProjectExcellence #Andritz #GrowthThatMatters

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • One of the key technologies at the heart of the energy transition is pumped storage hydropower plants.🔋These "green batteries" offer an efficient way of balancing the natural fluctuations of renewable energy sources and stabilizing the electricity grid, thereby ensuring a secure supply. An outstanding example of the use of this technology is the Ebensee pumped storage power plant in Upper Austria, which will be operated by @Energie AG. The construction of Energie AG's Ebensee pumped storage power plant is a major step toward climate neutrality 🌿 and achieving the climate targets for Upper Austria and Austria as a whole. The Ebensee pumped storage power plant is scheduled to be connected to the grid in 2028 and will supply about 280,000 households with green electricity. - On course of climate neutrality! ✅ 👉 Read more about Ebensee in Austria in our latest customer magazine HydroNews No.38, available online and in our Hydro News App for Apple and Android. Hydro News 38 (en) | Download the app here for Android https://lnkd.in/dAwaYwgX and here for Apple https://lnkd.in/d3zRZqdX #Hydropower #RenewableEnergy #CleanEnergy #PumpedStorage #PumpedHydro #ProjectExcellence #Andritz #GrowthThatMatters

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • 🌊 ANDRITZ powers the future: Seamless pumping mode operation for Bhira pumped storage unit! 🚀 Our journey with TATA Power began in 1997, when we first supplied the reversible pump turbine for the project. Over time, operational challenges emerged in pump mode functionality. In March 2024, as the OEM, ANDRITZ conducted an in-depth site assessment to optimize the operational sequence for full-load pump mode. Overcoming intricate technical hurdles, our expert team meticulously fine-tuned the system. The result? A resounding success! In mid-March, Bhira pumped storage unit’s pump mode operation was rigorously tested, and the machine delivered exceptional performance. The greatest reward is the trust and appreciation of our valued customers. At ANDRITZ, we don’t just provide solutions; we create success stories! 🚀 #andritz #hydropower #renewableenergy #ForTheChange #energy #india #Tatapower

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +1
  • 🚀 Exciting progress at the Kembs hydropower plant in France ! 🚀 At the end of 2022, EDF (Electricité de France) asked ANDRITZ to replace the discharge ring on Group 3 at the Kembs site. This hydropower plant, built in 1933 on the Grand Canal of Alsace, plays a key role in the French energy infrastructure on the Rhine River. ANDRITZ was entrusted with the study, manufacturing, demolition, and installation of the new discharge ring. At the end of March, we reached a crucial milestone with the installation of the new discharge ring which was completed successfully and on time. 🗓️ This milestone marks a significant turning point for the continuation of the project. Technical data of the renovated group: • Propeller turbine, 6.82 meters ∅ • Nominal head: 14.2 m • Maximum flow: 245 m3/s • Maximum power: 28 MW 🤝 Thanks to our partners and teams! 🤝 A huge thank you to @EDF for their trust, as well as to our valuable partners: Saert for the demolition, Metalúrgica Gallega for the manufacturing, and of course, the entire project team for their exceptional and incident-free work. Your dedication is the key to our success. 👏 This project perfectly illustrates our expertise and commitment to providing cutting-edge technical solutions for the energy sector. Follow us for more updates on our projects and innovations! #Hydropower #RenewableEnergy #ANDRITZ #EDF #Innovation #Security #EDF

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +1
  • ✨ ANDRITZ Triumphs at Dikrong Hydro Project ✨ Dikrong Hydro Project, India - ANDRITZ proudly announces the successful repair of the main inlet valve (MIV) and draft tube liners at the Dikrong hydro project, thanks to the unwavering support of our esteemed client, M/s. NEEPCO. Striving for excellence, team ANDRITZ completed the works ahead of schedule! 🚀 It is worthwhile to mention that Dikrong hydro project is the first non-OEM project where ANDRITZ is also undertaking comprehensive operation & maintenance works. 🌟 ANDRITZ goes above and beyond to ensure growth that truly matters, placing the utmost importance on our customers' needs and satisfaction! 💪😊 #andritz #hydropower #renewableenergy #ForGrowthThatMatters #energy #india #WeCommittedNoHarm

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • Successful model testing of Jaguara, Brazil! The model tests for the modernization of the Jaguara hydropower plant were successfully completed at the laboratory in Linz, Austria. This phase was crucial to validate the design of the Francis runner, guide vanes and stay vanes, ensuring the reliability and efficiency of the developed solutions. According to Bruno Cateli, Project Manager, the tests simulated real and critical conditions, evaluating performance, cavitation, and hydraulic behavior, with precision ensured by modern dimensional controls. “Model testing is a critical step in the development of turbine engineering, allowing the simulation and validation of designed solutions by comparing experimental results with computational fluid dynamics (CFD) analyses. The technical team from ENGIE, our contractor, monitored the entire process alongside experts and the CEO of ANDRITZ Hydropower Brazil, Dieter Hopf. Now, we move on to the manufacturing of the components, which will be installed at the plant starting in September 2025, with completion expected by 2028,” he explained. The project now advances to the manufacturing of the validated components, which will be installed in the four units of the Jaguara hydropower plant. Currently, around 45 team members are engaged in preparatory activities. #Hydropower #RenewableEnergy #ANDRITZ #TurbineEngineering #Modernization #turbine

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image

Affiliated pages

Similar pages

Browse jobs