Post de FlatironDragados

Voir la Page de l’organisation de FlatironDragados

172 950  abonnés

Our Rodanthe Bridge project on the Outer Banks of North Carolina, completed in 2022, reflects our commitment to providing resilient, sustainable and innovative infrastructure. Rodanthe Bridge replaced a key section of North Carolina Highway 12 known locally as the S-curves, subject to frequent flooding and washouts. Building the 2.4-mile span extending into Pamlico Sound required innovative approaches because of the environmentally sensitive shallow-water area. To meet the challenge, our project team developed the Advancing Rail System which combines the ability to straddle the newly built bridge structure and to leapfrog temporary work sections. This allowed easier movement of the massive concrete piles that support the bridge and helped the team significantly reduce environmental disruption to the surrounding areas. Today, Rodanthe Bridge provides a safe, reliable, and easier-to-drive elevated roadway for residents and tourists connecting the mainland to Rodanthe and other Outer Banks barrier islands. -- Notre projet de pont Rodanthe sur les Outer Banks de la Caroline du Nord, achevé en 2022, reflète notre engagement à fournir des infrastructures résilientes, durables et innovantes. Le pont Rodanthe a remplacé un tronçon clé de l’autoroute 12 de la Caroline du Nord, connu localement sous le nom de courbes en S, sujet à de fréquentes inondations et emportements. La construction de la travée de 2,4 milles qui s’étend jusqu’au détroit de Pamlico a nécessité des approches novatrices en raison de la zone d’eau peu profonde sensible sur le plan environnemental. Pour relever le défi, notre équipe de projet a mis au point le système ferroviaire avancé qui combine la capacité de chevaucher la structure du pont nouvellement construite et de sauter des sections de travaux temporaires. Cela a permis déplacement plus facile des pieux de béton massifs qui soutiennent le pont et a aidé l’équipe à réduire considérablement les perturbations environnementales dans les zones environnantes. Aujourd’hui, le pont Rodanthe offre une route surélevée sûre, fiable et plus facile à conduire pour les résidents et les touristes reliant le continent à Rodanthe et aux autres îles-barrières d’Outer Banks.

  • Aucune description alternative pour cette image
  • Aucune description alternative pour cette image
  • Aucune description alternative pour cette image
Mohamed Shawky

The Drone Expert ✈️

1 sem.

Le développement du système ferroviaire avancé est impressionnant 🤯! Il optimise le transport des matériaux lourds tout en minimisant les impacts environnementaux 🌿. Une véritable prouesse technique! 🚀

William Toomey

CEO Consultant Specialty Chemical Group OPTIMIZE Water Reuse and Fluid Process Recovery Systems ---Turnkey Complete Training for Operations Optimization---Process Chemicals MATCH Process Equipment SYSTEMS

1 sem.

Well done!

Angel Chagolla

Segment and Upper Pylon Erection General Foreman (Harbor Bridge Project)

1 sem.

I miss my hometown

Luís Caetano

Diretor de Engenharia I Gerente de Programas, Projetos e Mudanças | Infraestruturas Urbanas e Rodoviárias | Construção Civil | PMO Sênior | P&D Produtos

1 sem.

Congratulations! It's literally a masterpiece of engineering!

Samuel Ward

Tech.Engineer III at NCDOT Bridge Maintenance

1 j.

It was a honor and privilege to have been a part of this project.

Tonya R.

Executive Administrative Assistant

3 j.

Ignored and disgarded after one of THEIR cones flew out on the freeway and wrecked my car. THEY REFUSE TO TAKE RESPONSIBILITY!!!!!!!!!!!!!!!!! It's really a disgrace. You don't want to do what's RIGHT!!! DO WHAT'S RIGHT!!!!!!!!!!! DO WHAT'S RIGHT!!!!!!!!!!!

Abdullah Mohammad

Quality Assurance Coordinator

1 sem.

Great progress 🙌🏼

Deanna Brewer

Senior Vice President, Surety Account Executive, American Global Canada

1 sem.

Impressive work

Boris Germanov

Founder & Managing Partner at Boris & Associates Inc | Driving Digital & Business Transformation in Construction | Empowering People, Processes & Technology

6 h.

Really cool project! Congrats to the teams involved!

We call it the Jug Handle

Voir plus de commentaires

Identifiez-vous pour afficher ou ajouter un commentaire

Explorer les sujets