Daniel Steyn

دبي الإمارات العربية المتحدة
٤ آلاف متابع أكثر من 500 زميل

انضم لعرض الملف الشخصي

نبذة عني

My strength lies in defining critical objectives and driving improvement through focussed…

الخدمات

مقالات Daniel

الإسهامات

النشاط

انضم الآن لعرض كل النشاط

الخبرة والتعليم

  • LEOS International

عرض خبرة Daniel الكاملة

تعرّف على المسمى الوظيفي للأشخاص ومعدل بقائهم في العمل والكثير غير ذلك.

أو

بالنقر على الاستمرار للانضمام أو تسجيل الدخول، فأنت توافق على اتفاقية المستخدم واتفاقية الخصوصية وسياسة ملفات تعريف الارتباط على LinkedIn.

التراخيص والشهادات

انضم الآن لعرض جميع الشهادات

المشروعات

  • Cyber Security Project Roadmap

    -

    A multi-year program to transform the maturity governance, cyber security, risk and compliance from a reactive, passive state to a pro-active, managed and reported state integrated with the rest of the organization.

    This involved building internal team capacity, change management and communication throughout the organization to develop and implement new policies.

    Initiatives included assessments, security reviews and systematic improvement of CSAT scores by addressing basics…

    A multi-year program to transform the maturity governance, cyber security, risk and compliance from a reactive, passive state to a pro-active, managed and reported state integrated with the rest of the organization.

    This involved building internal team capacity, change management and communication throughout the organization to develop and implement new policies.

    Initiatives included assessments, security reviews and systematic improvement of CSAT scores by addressing basics, developing and implementing security policies, and best-fit products and partners

    مؤلفون آخرون
  • in2food Paarl factory Build (IT Infrastructure)

    -

    Design, Cost, Procure and implement IT infrastructure for a new food manufacturing facility, coordinating with the construction project team and contractors. IT Infrastructure included structured cabling, networking equipment, telephone systems, connectivity, power protection and server hardware and servers all with the requirement for high availability, security and future expansion. The IT implementation team consisted of several outsource vendors and specialist teams.
    Specialist teams…

    Design, Cost, Procure and implement IT infrastructure for a new food manufacturing facility, coordinating with the construction project team and contractors. IT Infrastructure included structured cabling, networking equipment, telephone systems, connectivity, power protection and server hardware and servers all with the requirement for high availability, security and future expansion. The IT implementation team consisted of several outsource vendors and specialist teams.
    Specialist teams often needed to be coordinated and multi team dependencies such as cabling, then networking, then telephones needed to be managed, while staying coordinated with the construction teams, such as electrical engineers, furniture and finishing. The project was delivered on budget and on-time, and the outcomes of reliability, security and expand-ability has been real-world tested and continues to be fit-for-purpose.

    مؤلفون آخرون
  • Citrix SD-WAN Rollout

    -

    Role: Overall Project Manager. To replace the existing MPLS with a more resilient SD-WAN solution to underpin the planned ERP centralization that would require stable connectivity. aA key part of the cost control was to impliment a VOIP system as part of the SD-WAN rollout in order to remove Telco copper telephone, thereby reducing costs. The project required installation by several vendors, and this process was managed by and outsource company. Since installation occurred at 13 different…

    Role: Overall Project Manager. To replace the existing MPLS with a more resilient SD-WAN solution to underpin the planned ERP centralization that would require stable connectivity. aA key part of the cost control was to impliment a VOIP system as part of the SD-WAN rollout in order to remove Telco copper telephone, thereby reducing costs. The project required installation by several vendors, and this process was managed by and outsource company. Since installation occurred at 13 different sites, each as a sub-project, coordination and communication was key. The project was slightly delayed at the tail end by covid `9 lockdown, but the project was completed on budget.

  • in2food Bonaero factory build (IT Infrastructure)

    -

    Gather requirements, architect, design, cost, procure and implement IT infrastructure for a new food manufacturing facility, coordinating with the construction project team and contractors.

    IT Infrastructure included structured cabling, networking equipment, telephone systems, connectivity, power protection and server hardware and servers all with the requirement for high availability, security and future expansion.

    The IT implementation team consisted of several outsource…

    Gather requirements, architect, design, cost, procure and implement IT infrastructure for a new food manufacturing facility, coordinating with the construction project team and contractors.

    IT Infrastructure included structured cabling, networking equipment, telephone systems, connectivity, power protection and server hardware and servers all with the requirement for high availability, security and future expansion.

    The IT implementation team consisted of several outsource vendors and specialist teams.
    Specialist teams often needed to be coordinated and multi-team dependancies such as cabling, then networking, then telephones needed to be managed, while staying coordinated with the construction teams, such as electrical engineers, furniture and finishing. The project was delivered on budget and on time, and the outcomes of reliability, security and expandability have been real-world tested and continue to be fit-for-purpose.

  • Fruit ripening, sorting and stock management system development

    -

    Role: Data Analyst, Process flow analyst and project manager. I inherited a failed implementation. I restarted the requirement gathering and analysis, and using an agile implementation methodology with the developers, the system was completed and implemented.

  • Pemba Beach Hotel

    -

    Provising highly resilient IT infrastructure, server and connectivity for a greenfields build of a 168 room 5 star hotel. I managed all aspects, including system architecture, procurement, project managment and post go-live support.

التوصيات المستلمة

12شخصا قدموا توصية لـDaniel

انضم الآن لعرض

المزيد من أنشطة Daniel

عرض ملف Daniel الشخصي الكامل

  • مشاهدة الأشخاص المشتركين الذين تعرفهم
  • تقديم تعارف
  • تواصل مع Daniel مباشرة
انضم لعرض الملف الشخصي الكامل

ملفات شخصية أخرى مشابهة

أعضاء آخرون يحملون اسم ⁦⁩Daniel Steyn

اكتسب مهارات جديدة من خلال هذه المواد الدراسية